翻訳と辞書
Words near each other
・ Samaria (ancient city)
・ Samaria (disambiguation)
・ Samaria (Mitcham) Bailey
・ Samaria (water)
・ Samaria Ostraca
・ Samaria, Idaho
・ Samaria, Indiana
・ Samarian spinel
・ Samariang Muslim Cemetery
・ Samaridae
・ Samarin
・ Samarina
・ Samarina, Estonia
・ Samarinbreen
・ Samarinda
Samarinda International Airport
・ Samarinda-Balikpapan Expressway
・ Samarinești
・ Samarinovac (Negotin)
・ Samarinovac (Žitorađa)
・ Samarinvågen
・ Samaris
・ Samaris (band)
・ Samaris (disambiguation)
・ Samariscus
・ Samaritaine (Charleroi Metro)
・ Samaritaine (football club)
・ Samaritan (comics)
・ Samaritan (disambiguation)
・ Samaritan (Price novel)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Samarinda International Airport : ウィキペディア英語版
Samarinda International Airport

Samarinda International Airport (Abbrev.: BSB) is a main airport under construction in Samarinda, East Borneo. It is in the district of Sungai Siring. It is colloquially known as Sungai Siring Airport, to distinguish it from its predecessor, Temindung Airport.
The airport will replace Temindung Airport, and will be an important regional transportation centre, passenger hub and gateway for destinations in Nusantara (with 15 destinations). It will be East Kalimantan's busiest cargo gateway and busiest passenger airport.〔(【引用サイトリンク】title=BSB Juga Terkendala Semen )〕 It is also home to Kaltim's largest passenger terminal buildings.
The airport will be operated by Airport Authority Samarinda 24 hours a day and is the primary hub for Kaltim Airlines (the flag carrier of Samarinda).〔(【引用サイトリンク】title= Gubernur Kaltim Awang Faroek Kembali Usung Proyek Kaltim Airlines )〕 BSB is an important contributor to Samarinda's economy. About 6 airlines will operate flights from the airport to 15 cities across Indonesia. BSB will handle 5,000,000 passengers.〔
==History==

Sungai Siring Airport was designed as a replacement for the former Samarinda International Airport (commonly known as Temindung Airport) originally built in 1973. Located in the densely built-up Sei Pinang District with a single runway extending into settlements, Temindung had only limited room for expansion to cope with steadily increasing air traffic. By the 2000s, Temindung had become one of Kaltim's busiest airports – it far exceeded its annual passenger and cargo design capacities. One out of every 25 flights experienced delays, largely due to lack of space for aircraft, gates, and runway.
A 1992 planning study by Civil Aviation and Public Works departments identified the district of Sungai Siring, as a possible airport replacement site. Away from the congested city centre, flight paths would be routed over North Samarinda rather than populous urban areas, enabling efficient round-the-clock operation of multiple runways.〔http://tekno.kompas.com/read/2008/12/29/17574099/kutai.akhirnya.batal.bangun.bandara〕 The Sungai Siring (SGS) airport master plan was completed in 1995. In 1998, however, the government shelved the project for financial and economic reasons. The Airport Location Study was undertaken by Indonesian consultants. This study came up with four recommended locations for overall strategic development in Samarinda. One of the four assumed a new airport at Makroman; a second assumed a new airport at Palaran; the third assumed a new airport at Sungai Siring; and the fourth assumed a new airport at Bayur.〔Dibangun Dibiayai dan Dikelola oleh Pemda Kaltim, Techno Konstruksi, September 2013〕 In November 2003 the Governor of Kaltim announced that a decision had been made on the Airport Location Study. The strategy was a replacement airport at Sungai Siring.〔Rencana Pemprov Yang Diambil Pemkot, Kaltim Post, June 2009 by Felanans Mustari ST〕
The consultants advised that the earliest the airport could be opened was June 2009. However, in reaching the government's decision, this date was modified to December 2007. Construction of the new airport began in 2005.
The construction period was very slow; specialists considered only 2–3-year period was sufficient for this aviation project. There was uncertain future of the airport construction after Panitia Pengadaan BSB manipulated the nomination of PT NCR as the contractor. It was originally believed that BPKP preferred to keep everything investigated and minimise financial commitments for the project temporarily, therefore stopping all construction. In practice, the airport did not finish in time for the investigation. However, Kaltim gave an additional year's deadline.
Construction of the new airport was only part of the MP3EI Master Plan, which also involved construction of new road and rail links to the airport. The detailed design for the airport terminal was awarded to a consortium led by Waskita Karya with Airmas Asri as specialist designers for airport related aspects. Project architects were PT Waskita Karya.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Samarinda International Airport」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.